Trail Design Charette analyzes accessibility for pathways California State Parks sponsors problem solving and trail construction project at Prairie Creek Redwoods State Park. By Don Beers, California State Parks
The charette team members represented a wide variety of disciplines and expertise including disability/accessibility design, trail design and construction, assistive technology, archeology, geology, landscape architecture, park planning, physical engineering, ecology, inclusive recreation, surfaces and safety engineering and soil stabilization technology. A film crew led by Jay Moss and Bruce Schmiechen and still photographer Jack Hopkins documented the entire charette exercise and the follow up trail design and construction work. The charette process began with a field review of two trails (Prairie Creek and Foothill) both located at Prairie Creek Redwoods State Park. These trails served as the outdoor laboratory for the charette design process. Both trails were totally inaccessible and had numerous trail maintenance and resource degradation issues. Prairie Creek trail closely followed a stream and meandered through a broad and heavily forested stream valley. Its linear grades ranged from zero to thirty-six percent with most of the trail grade being under ten percent. Steep linear grades, step carriages and bridges with step approaches represented obstacles to accessibility. Roots protruding into the trail bed and wet saturated tread surfaces also created obstacles and barriers. Foothill trail was located on a steep hill slope and traversed through an old growth redwood forest winding around the giant trees both standing and fallen. The trail undulated around these ancient trees and the linear grades ranged from zero to fifty-nine percent with most of the trail being under twelve percent. Steep linear grades, severe cross slopes, narrow tread widths, precipitous drop-offs, step carriages and bridges with step approaches represented significant obstacles to accessibility. Roots protruding into the trail bed and seasonally wet and saturated tread surfaces were also obstacles and barriers. Once the field review was completed and a thorough image of both trails and their issues was conveyed to the charette participants each member gave a brief presentation on their respective disciplines and how it related to trails, accessibility and resource protection. This cross training exercise enabled the participants to obtain a fundamental understanding of each other's disciplines and their views regarding improving accessibility and protecting resources. Once the cross training was completed, the charette participants identified the commonalties and conflicts (conditions /design elements) between sustainable trail design, resource protection and accessibility. Commonalties Between Accessibility, Resource Protection & Sustainable Trail Design
Accessibility Conflicts With Resource Protection & Trail Sustainability
Resource Protection and Trail Sustainability Conflicts With Accessibility
Once the charette team completed identifying the potential conflicts between accessibility and resource protection and sustainable trail design they used their collective knowledge and experience to identify potential solutions and or mitigations to those conflicts. Solutions and/or Mitigations to Maximize Resource Protection and Sustainable Trails
Solutions and/or Mitigation to Maximize Accessibility
Upon the completion of the design charette, a core trail design group comprised of Phyllis Cangemi, Barry Atwood, Jay Moss, Karl Knapp and Don Beers re-evaluated Prairie Creek and Foothill trails armed with the design solutions and mitigations developed by the charette team. This group also relied upon their many years of experience in accessibility and trail design to develop the prescriptions necessary to improve the access of these trails without compromising park resources. In performing the redesign of these two trails the core group followed a process that could be duplicated by others regardless of the specific trail conditions or setting that may be encountered.. The landform was thoroughly researched and evaluated to identify potential trail routing needs, resource concerns, boundary issues, land use capabilities and political constraints. The trails were evaluated to ascertain if their initial layout and construction work was fundamentally sound. Trail conditions reflecting resource damage and sustainability problems usually are a manifestation of poor trail design or construction. These problems are usually attributed to not thoroughly understanding the land base and its capabilities and limitations. Also not identifying and laying out between major and minor control points (locations where the trail has to be or stay away from), not following curvilinear alignment principles and constructing trails that disrupt the surface and shallow ground water hydrology. These conditions or deficiencies needed to be corrected as a standard practice in trail reconstruction. In doing so, resource protection and sustainability issues were corrected and the trail's accessibility potential was significantly enhanced. Once major and minor control points were established the linear grade between those control points was identified and compared with the sustainable grade of the landform and the linear grade required too comply with accessibility standards. If the linear grades between the established control points were within accessibility standards then the trail was realigned between those control points if there were no resource or esthetic issues. New trail alignments incorporated curvilinear layout and maximized side hill construction. All abandoned trail segments were fully rehabilitated by recontouring the trial bench and re-vegetating the trailway with plants salvaged from the new alignments. If the linear grades between the control points were in excess of the accessibility standards then minor control points were evaluated to determine if they could be modified to reduce the linear grade between them. Example: constructing a retaining wall under a large tree (minor control) to allow the trail to pass under it and reduce the linear grade or lengthening a bridge at a stream crossing site (minor control) to elevate the approaching trail grades to reduce the linear grade. If the minor controls could not be modified without causing resource damage or sustainability issues the land base was evaluated to determine if additional linear run could be achieved through the use of properly placed topographic turns, climbing turns or switchbacks (turns). If minor control point modifications or turns could not be achieved to reduce the linear grades then those segments of trail could not comply with the accessibility standards for linear grade. However, those segments still were reconstructed to comply with those standards that they could meet i.e. tread width, cross slope, tread firmness and stability, overhead clearance, etc. Those trail segments that could be modified to comply with accessibility standards were so as to make the trail as accessible as possible. Trail re-design and reconstruction efforts focused on the simplest solution then graduated to the more complex as the situation dictated. Segments where the trail alignment met all the resource, sustainability and accessibility requirements were left untouched. Tread width and surface: Trail segments with minor trail bench and tread surface deficiencies were reconstructed to obtain a uniform linear grade and outslope. Locations where the tread surface failed to meet firmness and stability requirements were augmented with a crushed shale aggregate, that when blended with native soils produced a firm and stable surface that closely matched the color and texture of the native soils. This material also provided a good coefficient of friction during wet conditions and when the trail was littered with organic material. It also allowed water to percolate and evaporate through it minimizing resource impacts. Obstacles in the tread surface: Rocks or small roots were removed from the tread surface to provide a uniform and smooth trail tread. Larger roots were covered or capped with crushed shale rock and native soils to bridge over these obstacles (turnpiked) Vertical clearance in the travelway: Limbs protruding into the travelway or trees spanning across the travelway were removed if they did not comply with accessibility standards and their removal did adversely impact the resource or the user experience. Slight trail re-alignments were made if adjusting the trail route a few feet could provide proper clearance. Logs and vegetation were used along the side of the trail to guide the visually impaired user to the clear opening. When significant down trees (specimens) were encountered the trail was rerouted around them but came close enough to provide the user with an up close tactile experience. Combinations of steeper linear grades and cross slope: Where the linear grade was steeper (8 to 10%) and the cross slope was at 5% the trail was widened to between 48 and 60 inches and or the tread surface was improved by adding crushed shale rock. Combinations of steeper linear grades, cross slope and change of direction: Where these conditions existed the trail tread was widened to between 48 and 60 inches, the tread surface was improved by adding crushed shale rock and edge protection was installed along the radius of the turn. Edge protection: Edge protection was provided at locations where there were (1) a steep hazardous drop off along the outer edge of the trail, (2) steep linear grades, cross slopes and the trail had a precipitous drop off, and (3) a combination of steep linear grades, cross slopes and a change of direction. Edge protection consisted of native vegetation (if it was strong enough to restrain the user), logs and large tree limbs securely fastened to the ground, large rocks firmly attached to the ground, and combinations of hand rails, diagonal rails and or bull rails on bridge and puncheon structures. All edge protection used was installed to facilitate overland sheet flow and blend in with the natural surroundings. Edge protection was only installed at the locations where it was warranted. Drainage crossings: Small ephemeral drainages were traversed by constructing armored rip rap crossings (cobblestone), drainage lenses or installing culverts. Low volume perennial drainages were crossed using puncheon structures (boardwalks). Bridges were constructed to cross the larger perennial streams. All of these structures were designed to have a finished elevation of trail grade and the puncheon and bridges had edge protection. In performing the construction work every attempt was made to match the building materials to the natural environment and the local architecture. If synthetic materials were used (cellular confinement, geotextile fabric, etc.) they were hidden and covered by native soils and vegetation. Every attempt was made to make the finished trail seamless with the natural environment and provide a quality outdoor experience for all trail users. The charette design exercise proved to be a very educational experience. It brought people together with very diverse backgrounds and experiences and helped them learn from each other and expand their own knowledge and understanding of trail and accessibility design. It helped close the gap between trail/resource specialist and accessibility specialist and advocates. It helped identify the commonalties between good trail design and accessible design. It also showed that the conflicts between those two disciplines could be solved or mitigated with simple design and construction solutions that already exist and are commonly used by trail designers and builders. Finally, it defined a process for re-designing existing trails or designing new trails to maximize accessibility, protect resources and provide sustainable trails. This process can be applied universally to all trails regardless of their location or conditions. December 2003 |
|
Need trail skills and education? Do you provide training? Join the National Trails Training Partnership!
The NTTP Online Calendar connects you with courses, conferences, and trail-related training
Promote your trail through the National Recreation Trails Program
Some of our documents are in PDF format and require free Adobe Acrobat
Reader software.
Download
Acrobat Reader
![]() |
American Trails and NTTP support accessibility with Section 508: read more. |
Updated December 17, 2007
Contact us | Mission statement | Board of directors | Member organizations | Site map | Copyright | NRT | NTTP