Facebook Logo
Twitter Logo
Browse Common Topics
Section 508 Navigation
Search our Website

symposium logo

 

Stay Connected with the Symposium App

Be sure to download the Symposium App for more event details and these useful features: full descriptions of all sessions, speaker bios, real-time announcements, exhibitor listings, and create your own custom schedule.

Introduction to Mechanized Trail Construction Techniques

Date & Time: May 10, 3:00 to 6:00 p.m.; May 11-12, 8:00 a.m. to 5:00 p.m.
Cost: $400 (Includes lunch on all days)
Location: Hills and Dales MetroPark

One skilled machine operator and the right machine can do the work of many hand laborers in a fraction of the time. In a dollars and cents world, machines save you time and money on any given trail project.

An un-trained machine operator can do a lot of damage in no time and this often requires significant time to "clean up the mess." These situations have given machine built trail a bad image and left trail users and land managers wondering if there is a "better way."

The "better way" is using machines for the project but making sure the operators are well trained and skilled and have a light touch. This 2.5 day workshop will focus on giving participants a good head start and introduction into the world of mechanized trail building. Join us for this hot topic workshop and learn how to use machines, but yield a high level of finish and an "always been there" look.

Instructors are some of the best in the business with not only good machine skills, but also good teaching and instructional skills. Teacher to student ratios will be kept low and there will be plenty of hands on machine time to hone your skills on a range of different machines.

Topics to be covered include:
• Care and feeding of trail machines
• Trailer loading and securing the load
• Job Hazard Analysis (JHA) and general machine safety
• Different types of machines and applications (dirt pushers vs. diggers)
• Multiple attachments on versatile machines
• Rough grading and grubbing vs. finished grading trail maintenance with machines
• Road to trail conversions- making old road more effective recreational corridors
• New trail construction
• Extraction of a machine when you get in trouble
• Finish work behind the machines

This is a working and very hands on workshop, please come prepared for such. Being prepared includes having the following: good work clothing including rain gear, good boots, gloves, eye protection, hearing protection, and a hard hat. Lunch is provided each day but you will need to bring a pack for water, snacks, and extra clothing.

After a half day in the outdoor trade show area, we will head out to the Legacy Trail at Hills and Dales MetroPark to set up different stations with various machines and build a real world trail. We will provide lunches on each day of the workshop, first aid kits and all of the tools and equipment necessary for the workshop. Participants should plan on bringing hard hats, safety glasses, high visibility clothing, work gloves, and sturdy work boots.

Machines that we will train on include:
• Various sized Mini-excavators
• Sutter trail dozer

Instructor(s): Charlie Dundas and John Gibson, Tri-State Company

For more information on the Professional Trailbuilders Association, visit www.trailbuilders.org

 

 

 

 

American Trails

P.O. Box 491797
Redding, CA 96049-1797
(530) 605-4395
trailhead@americantrails.org


Warning: include(/ReusableCode/socialIcons.html) [function.include]: failed to open stream: No such file or directory in /usr/home/americantrails/public_html/americantrails/ReusableCode/footerDefault_1000.html on line 46

Warning: include() [function.include]: Failed opening '/ReusableCode/socialIcons.html' for inclusion (include_path='.:/usr/local/lib/php') in /usr/home/americantrails/public_html/americantrails/ReusableCode/footerDefault_1000.html on line 46